23rd March 2024 - Transit Conversion - Tidy Up!


Hi Folks....... I needed some pics of items we brought a few weeks back

So it was time to have a tidy up of the back of the Transit!.

I knew I would not be in there for long, as my body joints were very sore and my balance was very poor as well !

So out I went, and plugged in the mains lead, so I had some lighting.

Moved the steps, so I could get into the back and moved the wheelchair to it's side, so I had room.

In I go and I sit down on my stool and start removing items from the table/fridge freezer framework, So that I could sort out what we had brought and take there pics.



So I make a start around the battery storage area.



The battery storage area is in a right mess, just were to start ?.



Thats the top cleaned out and the lid removed, making good use of the sliding hinges!..



Have removed 2 of the storage batteries, and I start to find all the screws I was missing!



This side of the battery storage area is clean, I cannot get to the storage area in the bathroom till I remove all the boxes!.

Out Comes Gay Gordon, to suck up all the mess and he does a good job of it as well!!



The bathroom, will probably be my next area to clean, but not today!..



Above cab Storage area, needs a good tidy, but will have to wait till more space becomes available!.



Lynne takes over Gay Gordon to suck up all the mess around the kitchen area



The table/Fridge Freezer storage area, is waiting to be sorted thru and given a good clean up.
The frame is still needing to be completed



The bed area is a right mess, but over the next few weeks hopefully, a lot of the items stored on there, will be used up!..



Meanwhile, whilst I was working on the battery storage area, Lynne was busy sorting and putting away stuff that was stored on the kitchen unit...

Altho we only managed about an hour, before I was totally exhausted, I am well pleased with what we have managed to get done.

Ok it is only a start, but now at lest I just have to move my wheelchair and steps to be able to get inside and start on another area.

Next few jobs pencilled in are:- 1. cut and install back bed ply board (this will later have shelves added)

2. Nip to andrews and buy some ply board for roof panels and bathroom door.

3. Sort n put away items on table/ fridge freezer frame.